Skip to content
Beach volleyball · prefabricated unit

Prefabricated Shower and Changing Unit for a Beach Volleyball Facility

The shower and changing unit beside a sand court is nothing like the changing room of an indoor hall: players arrive sandy and wet, the air is humid and often salty, and use is seasonal. This page sets out the unit’s rooms, materials, siting and rough budget for a beach volleyball facility.

  • Three sizes for municipal beaches, hotels and tournament venues
  • Materials and details for sand and salt air
  • A visible budget formula: area × the m² range
Sample unit areas
18 · 27 · 48 m²
Sand court (sample)
22 × 14 m
Prefabricated m² range
7.000 – 12.500 ₺/m²
Use
Open season · demountable
Size

Three Unit Sizes by Type of Use

Short answer: At a beach volleyball facility the shower and changing unit is a small prefabricated building on its own foundation, outside the sand court. The sample programme has single-person changing cubicles, an enclosed shower, a WC and an equipment store rather than a team locker hall; the outdoor showers and foot-rinse point stay outside the building. The sample planning areas are 18, 27 and 48 m². At 7.000 – 12.500 ₺/m² the rough budget is 126.000 – 600.000 ₺ (foundation, transport, connections and VAT excluded).

Sample plan of a municipal and public beach unit, 18 m²A single row of 7.2 × 2.5 m enclosed area: two changing cubicles, one enclosed shower, one WC and an equipment store. The doors open onto one side; a dashed canopy is shown in front. 7.2 × 2.5 m 18 m² sample / schematic · enclosed area, canopy excluded canopy / shade
Size 1 · outdoor showers and cubicles

Municipal and public beach court

18 m² · 7.2 × 2.5 m Enclosed area

Many users arrive for a short time; because the first rinse happens at the outdoor showers, the enclosed part stays small.

  • 2 changing cubicles, 1 enclosed shower, 1 WC
  • Equipment store: net, balls, rakes
  • Outdoor showers and foot-rinse point outside the building
Rough budget 126.000 – 225.000 ₺ 18 m² × 7.000 – 12.500 ₺/m²
Sample plan of a hotel and resort unit, 27 m²A single row of 9 × 3 m enclosed area: three shower-and-changing cubicles and a towel and equipment store. The doors open onto one side; a dashed canopy is shown in front. 9 × 3 m 27 m² sample / schematic · enclosed area, canopy excluded canopy / shade
Size 2 · added to the pool infrastructure

Hotel and resort

27 m² · 9 × 3 m Enclosed area

Guests already use the changing rooms and showers in the main building; the unit adds to that infrastructure and shortens the walk to the sand court.

  • 3 shower-and-changing cubicles
  • Towel and equipment store
  • Water, hot water and sewer from the main facility line
Rough budget 189.000 – 337.500 ₺ 27 m² × 7.000 – 12.500 ₺/m²
Sample plan of a tournament and club facility unit, 48 m²A single row of 12 × 4 m enclosed area: two changing-and-shower sections, a referee and organiser room and an equipment store. The doors open onto one side; a dashed canopy is shown in front. 12 × 4 m 48 m² sample / schematic · enclosed area, canopy excluded canopy / shade
Size 3 · changing, referee room, store

Tournament and club facility

48 m² · 12 × 4 m Enclosed area

On tournament day pairs play many short matches; instead of a team changing hall, two changing-and-shower sections are built and used in turn.

  • 2 changing-and-shower sections (shower and WC included)
  • Referee and organiser room
  • Store: net, posts, balls, sieve and rake
Rough budget 336.000 – 600.000 ₺ 48 m² × 7.000 – 12.500 ₺/m²
The areas are sample planning values, not a federation or tournament rule. Amounts are 2026 market estimates.
Programme

What Rooms Does the Unit Contain?

What sets a beach unit apart shows in the programme table: no team changing hall, few enclosed showers, and a lot of space given to keeping sand outside the building.

Rooms of a beach volleyball unit · sample programme
Room Purpose What differs on the beach Size
Changing cubicle Getting dressed for a short time, leaving belongings Used between matches; the door opens toward the sand shake-off point 1 · 3
Enclosed shower Washing with fresh water and soap Few in number; the rough clean-up happens at the outdoor shower 1 · 2 · 3
Outdoor shower and foot rinse Rinsing off the sand before going inside Outside the building, on a hard-surfaced platform 1 · 2 · 3
Sand-trap grating and drain Holding the sand at the door Water passes the trap and runs to the line 1 · 2 · 3
WC Basic hygiene At a hotel the WC in the main building can be used 1 · 3
Changing-and-shower section Players getting dressed and washing Used in turn for many short matches, not by a team 3
Referee and organiser room Match schedule, registration and results desk Only at a venue that hosts tournaments 3
Equipment store Keeping the net, posts, balls and sand-care tools under cover Dismantled equipment is also kept here at season end 1 · 2 · 3
Canopy / shade Shade and a wind break in front of the door Not counted as enclosed area; a working area on a site open to sand and sun 1 · 2 · 3
Size column: 1 municipal and public beach, 2 hotel and resort, 3 tournament and club facility. The number of rooms is increased or reduced to suit the intensity of use.
Materials

Materials and Details Against Sand and Salt Air

Sand abrades, salty damp corrodes and the sun fades paint. The unit is designed around these three.

Fasteners

Bolts, screws, hinges and locks are among the parts most at risk of corrosion. In salty, humid air galvanised or stainless fasteners are chosen; which of the two is needed is decided at the survey, depending on the distance from the sea and the wind.

Profiles and cladding

For structural profiles and outdoor shower posts, hot-dip galvanising stands out. The outer skin and doors are chosen with a wipe-clean finish that withstands sand and sun.

Wet-area surfaces

In the shower sections the wall and floor surfaces must be waterproof and wipe-clean; PVC-faced panels and a waterproofed floor are used for this. The number of joints is kept low because sand packs into joints.

Floor, threshold and sand

There is a sand-trap grating in front of the door, a threshold at the door and a surface that reduces slipping with wet feet. The aim is that sand is not carried into the enclosed part: the player shakes off the sand, rinses the feet, then goes in.

Ventilation

Salty air and shower steam together raise the humidity. The cubicles get permanent ventilation; vents and door-bottom gaps are designed to limit sand entry, so the inside stays dry through the season.

Plumbing and draining

Fittings, pipes and connections are chosen to withstand salt. If the unit will be closed at season end, valves and drain points are planned from the start so the plumbing can be emptied.

These choices depend on the climate, the distance from the sea and the use; section, thickness and finish type are calculated in the project, and no fixed technical values are given on this page.
Siting

Where Does the Unit Go Relative to the Sand Court?

The unit does not sit on the sand court; it stands on its own foundation, outside the court’s sand layers. The diagram shows the unit, the sand shake-off platform and the outdoor showers beside a 22 × 14 m court.

Sand court, prefabricated unit and outdoor shower layout — sample diagramIn the plan, on the left and upwind, is a rectangular unit whose doors face the sand court; in front of it a dashed canopy, then two outdoor showers and a hard-surfaced platform with a sand-trap grating. On the right is a 22 × 14 m sand court with a 16 × 8 m playing area and a net in the middle. Two floodlight poles stand along the long side of the court, and a water and sewer line runs behind the unit. 16 × 8 m playing area 22 × 14 m sand area 6 1 2 3 4 5 7 to the main facility line Prevailing wind (sample direction) N sample layout · schematic
Sand court, prefabricated unit and outdoor shower layout: sample diagram

Numbers in the diagram

  1. Prefabricated unit

    In the example it is upwind and its doors face the sand court; with the doors turned away from the prevailing wind, less sand is blown in.

  2. Canopy / shade

    In front of the door it gives both shade and a wind break; it is not counted in the enclosed area.

  3. Sand shake-off and foot-rinse platform

    Hard surface and a sand-trap grating; the sand coming from the court stays here.

  4. Outdoor showers

    Outside the building, on the platform; the first rinse is done here.

  5. Sand court

    22 × 14 m: a 16 × 8 m playing area and a 3 m free zone on every side.

  6. Floodlight poles

    For night play; the cable route is planned together with the unit’s services.

  7. Water and sewer line

    Connected to the main facility or an existing line; waste water from the sand trap is not mixed into the court drainage.

Wind

The prevailing direction is checked at the survey. Wind carries sand to the door and the shower floor; so the doors are placed with their back to the wind, and where possible the unit is not put on the downwind side of the court.

Sun

The canopy shades the area in front of the door. If use is concentrated in the afternoon, the west-facing side is protected.

Sand carry-over

The platform and the grating come before the door. The player leaves the court, shakes off the sand, rinses the feet, then enters the cubicle; the walking route is laid out so that it enforces this order.

Sample plan

Sample Plan of a Tournament-Size Unit

We show the largest size in detail: a single 12 × 4 m row. Every room opens directly to the outside; there is no internal corridor.

Sample plan of a prefabricated shower and changing unit, 48 m²A single row of 12 × 4 m enclosed area: two changing-and-shower sections, a referee and organiser room and an equipment store. The door of every room opens onto the south side; in front of the doors is a canopy, and beyond it a sand shake-off and foot-rinse platform. Unit sample plan — 48 m² sample planning value · schematic wet area Changing and shower section 12 m² wet area Changing and shower section 12 m² Referee and organiser room 12 m² Equipment store 12 m² Canopy / shade — not counted in the area Sand shake-off and foot-rinse platform · outdoor showers outside the building 12 m 4 m
Sample plan of a beach volleyball unit: two changing-and-shower sections, a referee and organiser room, an equipment store

Room programme

Changing-and-shower section (2 of them)

12 m² each

The north half is the wet area: two showers and a WC. The south half is the dry area: a bench and hooks. The door opens to the dry area.

Referee and organiser room

12 m²

A table, chairs and a match-schedule board.

Equipment store

12 m²

The net, posts, balls, boundary webbing and sand-care tools sit on shelves; equipment taken down at season end is gathered here.

What lies outside the enclosed area

Canopy

12 × 1.5 m

Shade and a wind break in front of the door. It is not counted as enclosed area and is written as a separate item.

Platform and outdoor showers

outside the building

Sand-trap grating, foot rinse and outdoor shower posts; groundwork and services make it a separate survey item.

Total enclosed area: 4 rooms × 12 m² = 48 m². The areas are sample planning values.
Production and installation

How Is a Prefabricated Unit Made and Installed?

We manufacture and install the unit. The sequence follows the dependencies on site: no assembly before the foundation and services are ready, and no sand laid before the assembly is finished.

  1. Survey and siting

    The site, prevailing wind, sun, service points and type of use are seen on the ground. We carry out surveys and installation across Türkiye and on projects abroad.

  2. Programme and design

    Cubicles, showers, WC, store and, if needed, the referee room are set; dimensions and siting are drawn. Where a permit is required, the design is completed to the documents the authority asks for.

  3. Production

    Panels, wet-area sections and doors are prepared in production; corrosion-resistant fasteners are selected at this stage.

  4. Foundation and services

    The unit’s foundation and the water, sewer and electrical lines are prepared together with the excavation of the sand court. The foundation concrete and the connections are not included in the rough budget.

  5. Assembly

    The panels are joined on the foundation; doors, canopy and shower fittings are fitted. Laying the sand is left until after the unit is assembled.

  6. Season end: closing or dismantling

    At season end the unit is closed, or the panels are taken down and removed; the foundation and service ends stay in place. Connection points are planned from the start for reinstallation.

Being seasonal or demountable does not remove the permit question; see the permit note for details.

Tell us where the court is, how it will be used and where the main facility lines run; we will set the unit’s programme and siting on site and give you a written quotation.

Request a survey for the unit
With the court

Planning the Unit and the Sand Court Together

The unit and the sand court’s groundwork meet in the same excavation.

Excavation and foundation

The unit’s foundation and the court’s excavation are done on the same site; the machine and the haulage are shared.

Drainage and drain lines

The court drainage under the sand and the unit’s drain and waste-water line are laid out separately; cleaning the sand trap does not affect the court drainage.

Service routes

Water, sewer and electrical lines are laid during excavation; no re-excavation is needed once the sand is down.

Lighting

If night play is planned, a cable route for the court poles and the unit’s lighting is drawn together; if lighting will come later, the duct is left in during excavation.

Kerb and sand edge

The unit’s foundation and platform stay outside the sand kerb; the kerb holds the sand, and the hard platform reduces sand being carried toward the unit.

Sequence

The general order: excavation and service lines, unit foundation, court groundwork, unit assembly and, last of all, laying the sand. That way the sand is not soiled during assembly and heavy vehicles do not disturb the sand layer.

Excavation, drainage and sand budget for the sand court

Budget

Rough Budget for a Beach Unit

The rough budget is the sample enclosed area multiplied by the prefabricated m² range; the formula is shown on every row. Figures are 2026 market estimates, VAT excluded.

Three sizes · area × 7.000 – 12.500 ₺/m² · production and assembly
Size Enclosed area Calculation Rough budget
Municipal and public beach 18 m² 18 m² × 7.000 – 12.500 ₺/m² 126.000 – 225.000 ₺
Hotel and resort 27 m² 27 m² × 7.000 – 12.500 ₺/m² 189.000 – 337.500 ₺
Tournament and club facility 48 m² 48 m² × 7.000 – 12.500 ₺/m² 336.000 – 600.000 ₺

Included in the budget

  • Production and assembly of the prefabricated unit

Not included in the budget

  • Foundation concrete and ground preparation
  • Transport
  • Electrical, water and sewer connections, and utility subscriptions
  • Equipment and furniture
  • Platform, outdoor shower posts, sand-trap grating and canopy (a separate survey item)
  • VAT
Small units dominated by wet areas carry a high share of plumbing, so the price moves toward the upper half of the range; a dry store and referee room sit in the lower-middle. A 60 – 120 m² changing building is a separate item in the 400.000 – 1.000.000 ₺ range; the units here are smaller. The final price is set by a written quotation after the survey.
Permit

Permit and Approval Note

In Türkiye, a prefabricated building is subject to zoning legislation like any other structure and needs a building permit; there is no separate exemption for prefabricated or container buildings. On projects abroad the local regulations apply, and written information should be obtained from the relevant local authority.

Whether the unit is seasonal or demountable does not remove the question; the answer depends on the zoning status of the plot. Additional permits may be required in coastal and shoreline areas; ask the relevant authority. If the facility will be operated for a fee, ask separately about a business or operating licence as well.

Before work starts, written information should be obtained from the competent local authority; in Türkiye this is the municipality’s zoning department.

This section is general information only and is not legal advice.
Frequently asked questions

Frequently Asked Questions About the Beach Unit

Should the unit be seasonal or stay all year?

It depends on the usage calendar. On a court used only in the summer season the unit is closed or dismantled at season end; at a facility that stays open through the winter it stays in place. In both cases the foundation and service connections are planned accordingly from the start. Being demountable does not change the permit position.

Are outdoor showers enough, or is an enclosed shower essential?

For sand and salt, an outdoor shower is often enough as a first rinse; the enclosed shower is for people who want to wash with soap and fresh water before dressing. At a public beach the number is kept low; in hotel and tournament use it becomes part of the cubicle.

What protects the unit from corrosion in salty, humid air?

Several measures work together: galvanised or stainless fasteners, galvanised profiles, wipe-clean wet-area surfaces, permanent ventilation and regular maintenance.

Where does the shower water go together with the sand — does the drain not clog?

The grating on the platform and the sand-trap drain catch the sand first; the water passes the trap and runs to the line. The trap has to be emptied regularly during the season. Because the waste-water line is laid separately from the court drainage, cleaning the trap does not affect the court’s drainage.

If the hotel has pool showers, is a separate unit needed for the beach court?

If the changing area in the main building is far, or guests would have to walk a long way wet and sandy, an extra unit beside the court makes sense. The unit is kept small: shower-and-changing cubicles and a store; the WC and hot water are fed from the main facility line.

Should the unit be sized for a few tournaments a year?

If a tournament is held only a few days a year, the unit is sized for daily use; adding a referee and organiser room and a store is often enough for the tournament. If tournaments are frequent, a second changing-and-shower section is added, as in the sample plan.

If the court is played at night, should the unit’s lighting be planned with the court?

Yes. The area in front of the door and the platform are lit for evening use; the cable route is left in the same excavation as the court poles. The lux values for the playing area are given in the lighting section of the home page.

How does wind direction affect which way the door faces?

Wind carries sand to the door and the shower floor. Keeping the doors with their back to the prevailing wind and the canopy in front of the door reduces sand entry. Because the prevailing direction varies by locality, it is observed on site at the survey and considered together with the long axis of the court.

What is left when the unit is dismantled at season end?

The panels, doors and wet-area sections are taken down; the foundation slab, the service ends and the platform stay in place. The plumbing is drained and the ends are capped; connections wait ready for installing at the same point next season.

Contact

Tell Us About Your Project

Share your site location and approximate dimensions; we will call you to schedule a survey and prepare a written quote.

Fields marked with an asterisk are required.

Contact details